Long-time ABLC presenter John Oyen brought these slides to the main stage, as we looked in the Advanced Biofuels and a suite of “safe, smart and sustainable operations through solutions that digitalize, automate and electrify industry. Turns out that 62 percent of projects face cost overruns, 79 percent face schedule delays — that’s addressable, as these slides demonstrate.
Use your ← → (arrow) keys to browse