The BRGB Slim model generators with a power of 625 kilovoltamperes (kVA) are installed at the Binatural plant in Simões Filho (BA). They provide the energy that drives the equipment responsible for mixing the biodiesel manufactured by the plant, which is capable of producing up to 360,000 m³ of biodiesel per year – the 14th largest in the country.