The multi-dairy digester is expected to begin operations by year-end 2024 and produce more than 200,000 MMBtu per year of renewable natural gas (RNG). The digester is designed to collect waste from four dairies that are each located within one-half mile from the multi-dairy digester. The project is connected to the 36-mile Aemetis biogas pipeline.