The federal D3 RINs that were sold completed an independent review to enable the sale to be entirely comprised of Qualified RINs (QRINs) that have been verified to conform with regulations and identify sourcing. Separately, the California Low Carbon Fuel Standard (LCFS) credits from Q2 2023 production are expected to be generated at the end of Q3 after a verification process has been completed.
The Aemetis Biogas Central Dairy RNG Project has signed 37 diaries to supply biogas digesters with animal waste; has built and is operating seven dairy digesters; has installed over 33 miles of biogas pipeline which is planned to be utilized for the next 30 digesters; built and is operating a centralized biogas-to-RNG production facility; and has interconnected the RNG production facility to the PG&E gas utility pipeline.