The Utiel plant will use agro-industrial waste and will have the capacity to supply more than 5,300 homes with a gas of renewable origin that can be injected into the distribution network, avoiding the emission into the atmosphere of more than 4,300 tons of CO 2 eq/year.
The project is aligned with the Valencian Biogas Route, which promotes the construction of a hundred renewable gas plants in the region to produce 65% of the gas consumed by Valencian homes.