NextEra Energy Resources to build first landfill RNG project in Alabama

November 7, 2022 |

In Alabama, NextEra Energy Resources, LLC, and Coffee County, Alabama announced plans to build the first landfill renewable natural gas (RNG) production facility in the state of Alabama. The project will be located at a landfill owned and operated by Coffee County and interconnect with a pipeline owned by Southeast Gas, the leading gas utility in the region. All of the gas from the project will be sold to Southeast Gas under a long-term contract.

NextEra Energy Resources, will work with Coffee County to upgrade the existing landfill gas collection system and build a new RNG production facility that will capture and convert 1,100 standard cubic feet per minute of landfill methane gas per year to RNG. On an annual basis, the project is expected to capture over 16,500 metric tons of landfill methane for beneficial use. The Coffee County RNG Project is expected to create approximately 50 to 60 construction jobs.

More on the story.

 

Category: Fuels

Thank you for visting the Digest.