In Indonesia, Valmet will supply a partial bioconversion for PT. Cikarang Listrindo Tbk’s coal-fired circulating fluidized bed (CFB) boiler in Babelan, Indonesia. The investment reflects Cikarang Listrindo’s initiative for greener energy production and environmentally friendlier operation by reducing reliance on fossil fuels and cutting CO2 emissions.
The order was included in Valmet’s orders received of the fourth quarter 2023. Modification works are scheduled for the first quarter of 2025.
The rebuild of the coal fired boiler unit 2 is part of Cikarang Listrindo’s development program to increase the use of more sustainable fuels in combustion.
PT. Cikarang Listrindo is also utilizing renewable fuels in its steam generation process by rebuilding the existing CFB boiler in unit 2. Since the rebuild, up to 30 percent of the energy produced with coal in this boiler can be replaced by woodchips and other suitable biofuels.
Valmet’s delivery scope includes the engineering, supply and construction of a new biomass fuel feeding system and the addition of a flue gas recirculation system for the CFB boiler unit 2. The furnace bottom will also be modified to improve coarse material removal from the fluidized bed.
Tags: coal, Indonesia, Valmet
Category: Fuels